Assessment and evaluation of positive or negative impacts on the existing natural environment that the construction of the projects will have in the natural habitat, agriculture, flora and fauna, hydrological system, pollution hazards, navigation, road network and drainage structures etc.
Preparation of Structure Plan, Master Plan and Detailed Area Plan for the Extension of the Khulna Master Plan Area up to Mongla Town
Preparation of Development Plan of Cox’s Bazar Town and Sea Beach up to Teknaf including Maheshkhali and St. Martin Island
Preparation of Master Plan for Paurashavas under District Towns Infrastructure Development Project (Package S04)
Additional Drainage Study to determine a Sustainable Solution for the Drainage Problems in the Baggardona River Catchment Area.
Preparation of Master Plan for Paurashavas under Upazila Towns Infrastructure Development Project (Package # 11) 18 nos. Paurashava and Kuakata Tourism Center
Preparation of Resettlement Action Plan (RAP) and Social Impact Assessment (SIA) for Displacement of Squatter Communities of the Drainage Channels (Package No. DS-04).
Verification Survey on Chars livelihood Programme (CLP), Phase-I
Char Development and Settlement Project (CDSP) Phase-II
EIA Study on Construction of Bridge over River Rupsha in Khulna, Phase-2
IEE and ISIA Study on Construction of Bridge over River Rupsha in Khulna
Preparation of Structure Plan, Master Plan and Detailed Area Plan for Khulna City
Improved Sanitation Services Programme
Knowledge, Attitude and Practices (KAP) Survey
Char Development and Settlement Project (CDSP) Phase-I
Feasibility Study for the Construction of Jetties on Cyclone Prone Island
Preparation of Detailed Area Plan (2016-2035) For DMDP Area; Lot 1: Part-A (75,259 Hectare)
ADB Loan No. BAN-39298: Regional Development Planning (RDP) under City Region Development Project (CRDP)
Feasibility Study of Three Economic Zones (Sherpur in Maulvibazar and Anwara & Mirershorai in Chittagong) under Support to Capacity Building of Bangladesh Economic Zones Authority Project.
Preparation of Master Plan for Comilla City Corporation under District Towns Infrastructure Development Project (DTIDP).
Preparation of Master Plan for Pourashavas under District Towns Infrastructure Development Project (DTIDP), Package-SO2.
Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project (UTIDP), Package-06.
Preparation of Master Plan for Pourashavas under Upazila Towns Infrastructure Development Project (UTIDP), Package-04.
Detailed Survey and Preparation of Drainage Master Plan for Khulna City.
Preparation of Structure Plan Master Plan and Detailed Area Plan for Sylhet Divisional Town.
Preparation of Detailed Area Plan (DAP) of Group-E for Dhaka Metropolitan Development Plan (DMDP).
Preparation of Detailed Area Plan (DAP) of Location-10 (East Baridhara from Purbachal connecting Road to Begunbari Khal) for DMDP.
Preparation of Detailed Area Plan (DAP) for Mirpur North to Uttara Area (Location-1) for DMDP.
Preparation of Detailed Area Plan (DAP) for Kamrangir Char Area (Location-2) for DMDP.
Master Plan Preparation for Maulvibazar, Habiganj, Lakshmipur, Khagrachari, Rangamati & Bandarban Pourashava under UGIIP-III of LGED; ADB Loan No. 3142 BAN.
Feasibility Study and Preparation of Master Plan for Abdul Monem Economic Zone (AMEZ) at Gazaria, Munshiganj.
Feasibility Study and Preparation of Master Plan for Ibrahim Hi-Tech Economic Zone at Siddhirganj, Narayanganj